> ## Content Index
> Fetch the complete content index at: https://jatan.space/llms.txt
> Use this file to discover other available public pages before exploring further.

# Moon Monday #149: The latest updates on lunarbound hardware and missions
- URL: https://jatan.space/moon-monday-issue-149/
- Published: 2023-10-16T14:36:28.000Z
- Updated: 2024-02-21T09:14:50.000Z
- Author: Jatan Mehta
- Tags: Moon Monday

**Two clarifications from [Moon Monday #148](https://jatan.space/moon-monday-issue-148/):* Most of the enhanced mobility I referred to provided by Axiom’s upcoming [AxEMU spacesuits](https://www.axiomspace.com/axiom-suit) for crewed Artemis astronauts isn’t in contrast to NASA’s [xEMU units](https://www.nasa.gov/image-feature/exploration-extravehicular-mobility-unit-xemu) but rather the current [EMU suits](https://www.nasa.gov/image-article/extravehicular-mobility-unit-emu) in operation at the International Space Station. In fact, being based on xEMU, AxEMU inherits most of its enhanced mobility. Second, NASA hasn’t “shelved” the xEMU suits; the agency actively uses them for training and development, wherein they better represent the [upcoming suits](https://jatan.space/moon-monday-issue-80/) as compared to EMUs. NASA’s Technical Reports Server has [more development updates](https://ntrs.nasa.gov/search?keyword=xEMU&q=%22xEMU%22) on the matter. I apologize for any confusion caused in the above.*

## Prepping for long-term activity at our Moon

![](https://jatan.space/content/images/2024/02/https-3a-2f-2fsubstack-post-media-s3-amazonaws-com-2fpublic-2fimages-2f25f8bfb2-568c-4094-9362-05ff34a36637_2250x1500-jpeg.jpg)

A Xodiac rocket mid-tethered-flight. [Image: Astrobotic](https://www.youtube.com/watch?v=5e8j52oO7fo)

- Earlier this month, Astrobotic [completed a test campaign](https://www.astrobotic.com/xodiac-flies-first-astrobotic-customer-campaign) of [Masten-Space-inherited](https://www.astrobotic.com/astrobotic-acquires-masten-space-systems) Xodiac rocket ‘[tethered liftoff and landing](https://www.youtube.com/watch?v=5e8j52oO7fo)’ flights for the NASA-funded prototype laser sensor called [Ejecta STORM](https://twitter.com/DrPhiltill/status/1711721990019580397). Combined with previous such high fidelity tests—short of a Moon mission—Ejecta STORM is helping scientists better understand how [lunar lander rocket plumes affect lunar soil](https://www.nasa.gov/directorates/spacetech/game%5Fchanging%5Fdevelopment/projects/PSI), and thus help quantify and characterize [risks posed](https://arxiv.org/abs/2102.12312) by lander plumes to various kinds of nearby lunar hardware and future habitats. A [White Paper](https://arxiv.org/abs/2102.12312) submitted to the [2023-2032 US Decadal Survey](https://jatan.space/moon-monday-issue-74/) strongly recommended future NASA Moon missions to carry instruments for specific plume effect measurements, and that such data be public. Ejecta STORM hopes to aboard one such mission.
- SpaceX is testing the [extended fairing](https://spaceexplored.com/2021/08/22/spacexs-new-falcon-heavy-extended-payload-fairing-will-not-be-recovered) made for its Falcon Heavy rocket to accommodate more/larger payloads, Stephen Clark [reports](https://arstechnica.com/space/2023/10/nasas-falcon-heavy-era-begins-this-week-with-launch-of-asteroid-mission). This fairing design will house the two pre-docked [propulsion](https://www.nasa.gov/press-release/nasa-awards-artemis-contract-for-lunar-gateway-power-propulsion) and [habitat](https://www.nasa.gov/press-release/nasa-northrop-grumman-finalize-moon-outpost-living-quarters-contract) modules of the NASA-led crewed international [Gateway lunar orbital station](https://www.nasa.gov/gateway) for their Falcon Heavy launch to Earth orbit in late 2025\. With a combined mass of about 18,000 kilograms, it will be SpaceX’s heaviest spacebound payload haul yet. NASA’s [$331.8 million contract](https://www.nasa.gov/news-release/nasa-awards-contract-to-launch-initial-elements-for-lunar-outpost) for this launch includes some of the development cost for said extended fairing. Relatedly, Jeff Foust [reported](https://spacenews.com/northrop-grumman-takes-36-million-charge-on-nasa-gateway-module) in July that NASA’s decision to pre-mate the said two Gateway modules one led to some mass constraints, which combined with evolving Gateway requirements from the agency, resulted in contractor Northrop Grumman taking a $36 million hit in building the habitable module.
- China’s [Chang’e 7](https://doi.org/10.34133/space.0026) orbiter—targeting a 2026 launch alongside the namesake [lander](https://www.leonarddavid.com/china-outlines-permanently-shadowed-crater-exploration-lunar-resource-utilization-plans)—will carry a 3-kilogram instrument duo from the National Astronomical Research Institute of Thailand (NARIT) to study [solar storms](https://jatan.space/the-sun-and-its-wind/) and cosmic rays respectively, Ling Xin [reports](https://www.scmp.com/news/china/science/article/3237651/thai-lunar-weather-instrument-set-join-chinas-change-7-mission-moon). Thailand, with involvement from a NARIT delegation, [joined](https://www.narit.or.th/index.php/en-news/3552-en20231005-01) the upcoming China-led long-term [scientific Moonbase](https://jatan.space/moon-monday-issue-120/) on the lunar south pole called the [International Lunar Research Station](https://jatan.space/moon-monday-issue-32/) (ILRS) on September 25\. NARIT is Thailand’s largest space research organization, and operates the Thai National Radio Telescope. The latter could be used to monitor spacecraft trajectories of ILRS missions. Relatedly, there are (as yet unspecified) six more international payloads on the Chang’e 7 mission, including a detector for lunar dust and electric fields as well as a telescope on the lander.

![](https://jatan.space/content/images/2024/02/https-3a-2f-2fsubstack-post-media-s3-amazonaws-com-2fpublic-2fimages-2f9b5174a1-a172-48aa-a01f-fa94373926ca_1920x1280-jpeg.jpg)

An illustration of the Chang’e 7 lander and orbiter in Earth orbit. [Image: China News Service](https://www.narit.or.th/index.php/en-news/3552-en20231005-01)

---

*Many thanks to *[Epsilon3](https://www.epsilon3.io)* for sponsoring this week’s Moon Monday.*

---

## NASA concurs concern for the SLS rocket’s sustained existence

The [SLS rocket](https://www.nasa.gov/exploration/systems/sls/overview.html) just cannot catch a break. In yet another [scathing analysis](https://oig.nasa.gov/docs/IG-24-001.pdf), following the [September 7 report](https://www.gao.gov/assets/gao-23-105609.pdf) by NASA’s Government Accountability Office (GAO), the agency’s Office of Inspector General (OIG) has concluded that NASA will likely fail to achieve the aspirational 50% cost reduction in building SLS by end of decade. This is in reference to NASA [preparing to award a single launch service contract](https://spacenews.com/nasa-prepares-to-award-sls-launch-services-contract-to-boeing-northrop-joint-venture) for future SLS launches to Deep Space Transport LLC, a joint venture between two major SLS contractors Boeing and Northrop Grumman. Eric Berger [notes](https://arstechnica.com/space/2023/10/inspector-general-on-nasas-plans-to-reduce-sls-costs-highly-unrealistic) how under the contract terms Deep Space Transport has no incentive to lower prices.

The GAO’s September 7 report criticized the agency for continuing to be [not transparent enough](https://spacenews.com/gao-report-calls-for-more-transparency-on-sls-costs) about the true cost of SLS, something central to the nearly $100 billion [Artemis](https://www.nasa.gov/specials/artemis) Moon program. The OIG estimated in 2021 that, separately from development costs, the first three SLS flights will cost [$2.2 billion per launch](https://oig.nasa.gov/docs/IG-22-003.pdf). The OIG now says the flights following those will cost $2.5 billion per launch. This assessment is in line with the GAO noting growing costs despite the SLS moving into production.

Notably, not only had NASA officials acknowledged to the GAO that the SLS is “unsustainable” at its current level but the agency [concurred](https://spacepolicyonline.com/news/nasa-ig-skeptical-of-major-sls-cost-savings-from-services-contract) with the OIG’s confrontation as well, clarifying that the 50% cost reduction goal was “aspirational and not based on actual analysis.” The OIG has recommended that NASA look into using upcoming commercial heavy-lift vehicles instead of SLS to sustain the [Artemis](https://www.nasa.gov/specials/artemis) program and its ambitions:

> In our judgment, the Agency should continue to monitor the commercial development of heavy-lift space flight systems and begin discussions of whether it makes financial and strategic sense to consider these options as part of the Agency’s longer-term plans to support its ambitious space exploration goals.

![](https://jatan.space/content/images/2024/02/https-3a-2f-2fsubstack-post-media-s3-amazonaws-com-2fpublic-2fimages-2fec50f659-10e1-4fd0-8fe8-ee53d8c82cd3_1280x853-jpeg.jpg)

Will the Moon set for the SLS rocket? Not in this decade, it would seem. This view of SLS on the launchpad may be a sight we might want to get used to, at least for a while. [Image: NASA](https://www.nasa.gov/exploration/systems/sls/moon-shines-on-the-space-launch-system-rocket-on-the-launch-pad.html)

## More Moon

- [Chandrayaan 3](https://jatan.space/chandrayaan-3/) Project Director P. Veeramuthuvel [confirmed](https://www.youtube.com/live/-arcE8jFa6E?feature=shared&t=4995) in a recent talk at NIT Tiruchirappalli that ISRO did delay the mission’s launch to cater to the commitment of launching satellites for OneWeb. I had [argued in October 2022](https://jatan.space/moon-monday-issue-100/)how ISRO prioritized the two available GSLV Mk III rockets to (opportunistically) commercially launch OneWeb satellites instead of Chandrayaan 3\. Veeramuthuvel said Chandrayaan 3 was ready to fly in January 2023, which means while the first launched set of 36 OneWeb satellites [in October](https://indianexpress.com/article/india/isro-launches-36-oneweb-satellites-precisely-completes-mission-of-many-firsts-8225696) wasn’t a direct snatch [the February loft](https://jatan.space/indian-space-issue-03/) was. Oh, well. I too am excited about India’s growing commercial space capabilities but in my view they need not come at the expense of our [space science missions and ambitions](https://jatan.space/indian-space/), especially when the nation formally prides itself on its [purported space science achievements](https://jatan.space/how-to-honor-mangalyaan/).

![](https://jatan.space/content/images/2024/02/https-3a-2f-2fsubstack-post-media-s3-amazonaws-com-2fpublic-2fimages-2f0acab21f-0fdf-4b6d-aeaf-fcb88edfa03f-heic-1.jpg)

The Moonbound Chandrayaan 3’s launch aboard a GSLV Mk III rocket had a shadow trail. Metaphorically too. Image: Jatan Mehta

- In an interesting development to keep an eye on, DARPA and APL [announced](https://www.jhuapl.edu/news/news-releases/231011b-lunar-technology-development) the [Lunar Operating Guidelines for Infrastructure Consortium](https://logic.jhuapl.edu/index.php), or LOGIC, to hope to bring together varied international stakeholders so as to standardize upcoming lunar infrastructure. This would accelerate hardware development while maintaining interoperability.
- John Hopkins APL is [looking for a post-doctoral researcher](https://careers.jhuapl.edu/phd/jobs/54083?lang=en-us) who, with their expertise in working with lunar remote sensing data, will assist the [12-person](https://www.nasa.gov/feature/nasa-selects-geology-team-for-the-first-crewed-artemis-lunar-landing)*[ Geology Team](https://www.nasa.gov/feature/nasa-selects-geology-team-for-the-first-crewed-artemis-lunar-landing)* leading surface science investigations for NASA’s upcoming [Artemis III](https://www.nasa.gov/feature/artemis-iii) crewed Moon landing mission mid-decade.
- October 21 is *International Observe the Moon Night*! Other than checking out and sharing NASA’s [excellent guide](https://moon.nasa.gov/observe-the-moon-night/about/overview), may I also suggest browsing my humble complementary contribution to the worldwide effort to get people to look up to the Moon? Check out [my Moon projects](https://blog.jatan.space/moon-projects) for curious people from all backgrounds to learn more about our cosmic companion’s immense scientific, technological, and exploratory importance. If you like my labor of lunar love, share it with a friend, relative, or colleague you think might benefit from it:

[My Moon popularization projects 🌗](https://jatan.space/moon-projects/)

---

**→ [Browse](https://blog.jatan.space/start) | [Sponsor](https://blog.jatan.space/sponsor-moon-monday) | [About](https://blog.jatan.space/about) | [RSS](https://blog.jatan.space/feeds) | [Mastodon](https://jatan.space/fediverse)**